Battery knowledge · Charging infrastructure

Vehicle-to-everything

The umbrella term for using a vehicle’s battery as a source as well as a load: vehicle-to-load for appliances, vehicle-to-home, vehicle-to-building, vehicle-to-vehicle and vehicle-to-grid. All need bidirectional power electronics and, beyond the simplest, communication such as ISO 15118-20; the abbreviation is also used for vehicle communication networks.

Abbreviation
V2X
Also called
vehicle-to-building, V2B, bidirectional power transfer

Example

Charging infrastructure: an example situation

A 100 kW model request does not establish real voltage, current, connector or negotiation compatibility.

Read Vehicle-to-everything alongside Grid-to-vehicle in this context. Power flowing from the grid into a vehicle’s battery — ordinary charging, named to contrast it with vehicle-to-grid. Managed grid-to-vehicle charging shifts and modulates this one-way flow to suit the grid, offering flexibility without the extra battery cycling or the bidirectional hardware that two-way systems need.

Use in Lemonergy

Lemonergy Studio blocks

Model signed grid exchange

Explicit battery and converter exchange average power.

Blocks to use

  1. Scheduled import / export and load policy

    Requests signed power

    Inputs & settings
    • mode
    • reserveSoc / targetSoc
    • loadPower, outage → command
  2. Bidirectional grid / load interface

    Converts battery and grid/load power

    Inputs & settings
    • importEfficiency / exportEfficiency
    • importLimitW / exportLimitW
    • Electrical ports p and n
  3. Battery with SOC-dependent OCV

    Stores charge and supplies terminal voltage

    Inputs & settings
    • capacityAh
    • initialSoc
    • emptyVoltageV / fullVoltageV
    • resistanceOhm
    • Electrical ports p and n
  4. Electrical reference

    Sets zero potential

    Inputs & settings
    • Connect p to reference net

This overview identifies the components to use. Follow the example in Lemonergy for their connections and settings.

  1. Set export window and SOC reserve.
  2. Inspect power and energy.

Example. −5 kW requests export; +5 kW requests import. 5 kW exported at 95% efficiency needs about 5.26 kW battery power.

Observe. Reserve and converter limits can reduce export.

This excludes AC waveforms, synchronization, communications and certification.

Open the Studio example →

References & further reading

Further reading on this topic

These sources provide broader context; they are not presented as citations for every statement in this entry.

  1. Electric Vehicle Charging Stations

    U.S. Department of Energy, Alternative Fuels Data Center

    Topic background · U.S. charging equipment levels, charging infrastructure and connector context. Regional terminology varies.