Battery knowledge · Charging infrastructure
Pantograph charging
Fast charging of a bus through an automatic contact on the roof — raised from the vehicle or lowered from a mast — at the terminus or en route, at 150–600 kW for a few minutes. It allows a smaller battery at the price of high-rate cycling and more infrastructure.
- Also called
- OppCharge, SAE J3105
Example
Charging infrastructure: an example situation
A 100 kW model request does not establish real voltage, current, connector or negotiation compatibility.
Read Pantograph charging alongside Charge acceptance in this context. How much of the current offered to a battery it can actually absorb at a given state of charge and temperature. It falls as the battery fills and as it cools, which is why regenerative braking and fast charging are limited by the battery rather than the source.
Use in Lemonergy
Separate compatibility from requested average power.
This is a reference concept. No executable Lemonergy block has been verified for this term.
References & further reading
Further reading on this topic
These sources provide broader context; they are not presented as citations for every statement in this entry.
- Electric Vehicle Charging Stations
U.S. Department of Energy, Alternative Fuels Data Center
Topic background · U.S. charging equipment levels, charging infrastructure and connector context. Regional terminology varies.