EVCC and SECC
The two ends of high-level charging communication: the electric vehicle communication controller in the vehicle and the supply equipment communication controller in the charger. They exchange limits, schedules and authorisation over power-line communication on the control-pilot wire.
- Also called
- electric vehicle communication controller, supply equipment communication controller
Example
Charging infrastructure: an example situation
A 100 kW model request does not establish real voltage, current, connector or negotiation compatibility.
Read EVCC and SECC alongside Charging control unit in this context. The vehicle-side controller that manages charging: it detects the plug, talks to the charging station over the control pilot or ISO 15118 and DIN 70121, and passes the current and voltage limits the BMS allows. In some bus and truck architectures CCU also names a central or cluster control unit, so the system diagram decides.
Use in Lemonergy
Separate compatibility from requested average power.
This is a reference concept. No executable Lemonergy block has been verified for this term.
References & further reading
Further reading on this topic
These sources provide broader context; they are not presented as citations for every statement in this entry.
- Electric Vehicle Charging Stations
U.S. Department of Energy, Alternative Fuels Data Center
Topic background · U.S. charging equipment levels, charging infrastructure and connector context. Regional terminology varies.