Multi-cell balancing interface
One to eight independently commanded current-sink circuits with per-cell voltage, current and power; no hardware I/O.
- Implementation ID
balancing-interface- Reviewed
- 2026-10-27
Behavior
One to eight independently commanded current-sink circuits with per-cell voltage, current and power; no hardware I/O. The terminal current participates directly in Kirchhoff current balance and changes the connected battery state. Measurements are solved with the physical network.
Interface
| Name | Direction | Unit | Meaning |
|---|---|---|---|
p1 | terminal | V / A | Electrical conserving connection. Across variables are shared at a node; through flows balance. A pN/nN pair is created for each configured circuit, up to eight. |
n1 | terminal | V / A | Electrical conserving connection. Across variables are shared at a node; through flows balance. |
current1 | input | A | Optional typed command; otherwise the configured default is used. For balancing, currentN addresses the corresponding circuit. |
voltage1 | output | V | Observed voltage1. Each configured circuit has corresponding numbered measurements. |
current1 | output | A | Observed current1. Each configured circuit has corresponding numbered measurements. |
power1 | output | W | Observed power1. Each configured circuit has corresponding numbered measurements. |
Parameters
Defaults are initial model values. Select values for your own model and operating conditions.
| Parameter | Unit | Default | Meaning and limits |
|---|---|---|---|
Number of balancing circuitscircuits | circuits | 1 | Number of balancing circuits. Numerical bounds are model-validation limits, not physical operating ratings. Minimum 1; Maximum 8 |
Default current per balancing circuitdefaultCurrentA | A | 0 | Default current per balancing circuit. Numerical bounds are model-validation limits, not physical operating ratings. Minimum 0; Maximum 1000000 |
Equations and rules
I[j] = max(0, commanded current[j])P[j] = V[j]*I[j]
Worked example
Multi-cell balancing interface worked example
The bundled two-cell model commands 0.1 A from circuit 1 and zero from circuit 2. The first cell has 4 V OCV and 0.1 Ω resistance, giving 3.99 V under bleed. The second 3.7 V cell remains unloaded.
Open Studio example after release →| Output | Time (s) | Expected value | Unit | Absolute tolerance |
|---|---|---|---|---|
First bleed currentcurrent1 | 1 | 0.1 | A | 1e-06 |
First cell voltagevoltage1 | 1 | 3.99 | V | 1e-06 |
Use in a workflow
Multi-cell balancing interface worked example
One to eight independently commanded current-sink circuits with per-cell voltage, current and power; no hardware I/O.
- Multi-cell balancing interface: One to eight independently commanded current-sink circuits with per-cell voltage, current and power; no hardware I/O. The terminal current participates directly in Kirchhoff current balance and changes the connected battery state. Measurements are solved with the physical network.
- Use the parameter values in the block reference.
- Implementation tested locally; public release pending.
Connected concepts
Limits and interpretation
- This is a simulated electrical interface without a target-hardware driver. SOC and temperature pass-throughs, diagnostic mode flags and hardware-specific communication are outside this interface.
- One to eight independently commanded circuits per instance. The default contract shows one circuit; the worked example configures two.
Scientific and mathematical references
These sources explain the scientific and mathematical background. The behavior, interface and limits above define the Lemonergy implementation; a citation does not imply every model option in the source is implemented.
- Getting Started with the BQ76925
Texas Instruments · 2019
Technical reference · A concrete BMS analog front-end example: cell voltage, current, temperature measurement and MCU integration.
Implementation sources
This reference follows the public interface and locally verified numerical checks for an upcoming release.
Contract: Lemonergy Studio public contract · Verification record: verification-2026-10-27